ss_blog_claim=aae9c47a58018c8fd4404277d6318ba1
Pipe Data Pro Version 7.3 Built 76
 
Custom Search
The image “http://www.envision-sbs.com/banners/468-60_4.gif” cannot be displayed, because it contains errors.

July 30, 2008

Boiler B at Dung Quat Oil Refinery put into trial operation

Boiler B was put into trial operation by Dung Quat Oil Refinery project management board and its contractor Technip.

Dung Quat Oil Refinery is designed to have four boilers A, B, C, D, with each having capacity of 196 tonnes of super high-pressure steam an hour.

These four boilers have their key function of supplying steam to run four power-generating turbines, each has a capacity of 27MW, thus ensuring safe power supply to the operation of Dung Quat Oil Refinery.

Via: Nhan Dan 

 

Tags: , ,

Share This Post
Permalink • Print • Comment

Trackback uri

http://www.azpiping.com/boiler-b-at-dung-quat-oil-refinery-put-into-trial-operation/trackback/

Track this entry

RSS BlogPulse

RSS Technorati Cosmos

Related Entries

Related Searches

, , , ,

Related Tags

, , , ,

Tell a Friend

Leave a Comment